Geosynthetics Engineering Journal
Online ISSN : 1883-146X
Print ISSN : 1344-6193
ISSN-L : 1344-6193
PROOF EXPERIMENT ON TEMPORARY ACCES CONSTRUCTED ON RICE FIELD USING PALACE SHEET
Junichi GOTOUKazuo MIURAKenichi SHIBATAKazutaka KARASAKITetsuo KAWAIYukiyoshi KITAMOTOTeru YOSHIDA
Author information
JOURNAL FREE ACCESS

2006 Volume 21 Pages 41-44

Details
Abstract
The Palace seat industrial method is a soft subsoil reinforcement industrial method with which the reinforcement frame is formed by injecting mortar into a lattice jacket that integrated with the engineering works seat.
This time, the proof experiment that constructed the temporary road of materials vehicular on the rice field using palace sheet was done. 120kN in weight heavy equipment ran with stability on the road that had been constructed on the soft subsoil using palace sheet.
It was able to be proven to be able to use the rice field as a temporary road of urgent disaster if it constructed it by this method.
Content from these authors
© Japan Chapter of International Geosynthetics Society
Previous article Next article
feedback
Top