Abstract
A technique is described for measuring the true pipe-to-soil potential of buried pipelines by means of an analog probe simulating a holiday in a coating on steel. Examples are given comparing data obtained from traditional measurements and the alternate. Results are also described of the practical applications to the field pipe-to-soil potential survey as well as corrosion rate survey.