Study on Risk Reduction of Electric Power Supply Restriction by Reinforcement of Interconnection Lines Between Areas for the Nankai Trough Earthquake
Tetsuya TorayashikiHiroaki Maruya
Author information
JOURNAL OPEN ACCESS

2016 Volume 11 Issue 3 Pages 566-576

Details
Abstract

Estimating electric power supply restrictions after the Nankai Trough earthquake and evaluating the need for reinforcing the capacity of lines interconnecting power supply areas, we found that capacity reinforcement of the Chubu-Kansai interconnection line used an electricity supply capability in the 60 Hz area of the western part of Japan after the disaster. We also found that this is effective in reducing risk in electric power supply restrictions, based on certain conditions. We also found by estimating construction and maintenance costs that the capacity reinforcement of the Chubu-Kansai interconnection line reduces risk and costs less than an east-west interconnection line.

Content from these authors

This article cannot obtain the latest cited-by information.

© 2016 Fuji Technology Press Ltd.

This article is licensed under a Creative Commons [Attribution-NoDerivatives 4.0 International] license (https://creativecommons.org/licenses/by-nd/4.0/).
The journal is fully Open Access under Creative Commons licenses and all articles are free to access at JDR Official Site.
https://www.fujipress.jp/jdr/dr-about/
Previous article Next article
feedback
Top