Proceedings of the Annual Conference of The Japan Institute of Energy
Online ISSN : 2423-8325
Print ISSN : 2423-8317
ISSN-L : 2423-8317
[volume title in Japanese]
Conference information

7-3-3 Estimation of energy supply potential and load by using thinning materials
Case study of Matsuda town, Kanagawa prefecture
Yuki OishiAtsushi AKISAWAMasahiro IWAOKA
Author information
CONFERENCE PROCEEDINGS FREE ACCESS

Pages 210-211

Details
Abstract

Currently, thinning is not progressing in many forests, and local governments are struggling to manage them. The reason why thinning does not progress is high cost of thinning and low merit for the owner of the forest. On the other hand, many local governments have attempted to introduce biomass energy, but it is difficult to achieve profitability without special support and subsidies, and there are few successful cases. Therefore, by introducing heat and electricity supply equipment such as boilers and cogeneration systems using thinning materials to public facilities, we considered a method of utilizing biomass energy while promoting thinning. In this research, while establishing the management method of the forest such as the place, the time, the quantity etc. where thinning should be performed, the economic efficiency and environmental property in case of introducing the biomass equipment are evaluated, and the optimum equipment configuration and operation method are found.

Content from these authors
© 2019 The Japan Institute of Energy
Previous article Next article
feedback
Top