Proceedings of the Annual Conference of The Japan Institute of Energy
Online ISSN : 2423-8325
Print ISSN : 2423-8317
ISSN-L : 2423-8317
[volume title in Japanese]
Conference information

3-2-2 A Cascade Biomass CHP for Bamboo Utilization
Kazutoshi MIMURAKenichi SASAUCHIKouji YAMADAKumi OKADAKatsuya TSURUYasuhiko SATOHaruo NISHIDAMasashi KATSUKIYukio TERAOKAKen-ichiro TANOUEKinya SAKANISHIMasayuki HORIO
Author information
CONFERENCE PROCEEDINGS FREE ACCESS

Pages 74-75

Details
Abstract

A Biomass CHP system was completed by Bamboo Energy Co., Ltd. in Nankan Town, Kumamoto Prefecture, in March 2019, as the first full-scale Organic Rankine Cycle in Japan using bamboo for biomass. It has a capacity of about 1 MW electricity, 2.8 MW thermal oil supply, and 4 MW warm water supply, with total energy efficiency of about 70%. The well-known difficulty of burning bamboo has been successfully solved by burning it with bark based on fundamental research for a long time. In this report the development from pilot tests to full scale plant is outlined.

Content from these authors
© 2019 The Japan Institute of Energy
Previous article Next article
feedback
Top