Journal of Japan Industrial Management Association
Online ISSN : 2187-9079
Print ISSN : 1342-2618
ISSN-L : 1342-2618
Performance Prediction on Progress Control Using a Logistic Cumulative Curve for Plant Construction
Yasushi YOSHIMURATetsuya TSUBOKURAYuuzi MIYAZIMATsuneyoshi HIRANOArio OHSATO
Author information
JOURNAL FREE ACCESS

2003 Volume 54 Issue 4 Pages 236-244

Details
Abstract
Progress control mostly depends on experience in construction projects because there are many factors which affect progress control and relation between factors is very complex. There is a concern that skilled project managers for plant construction will decrease in the future. It's necessary to clarify the factors and compose a standard control method. In this paper the knowledge of project managers in the area of progress control is clarified and a performance prediction method using their knowledge is presented. The construction model, which has the input of "delivery and construction ability" and the output as "accomplishment, labor and cost, " is presented. The performance prediction method using logistic cumulative curves about "accomplishment, labor and cost" is presented. The decision-making model and algorithm, which describe the performance prediction and performance evaluation, is clarified. As a result, the model and algorithm present the performance prediction method using the relation between planned logistic cumulative curves and actual logistic cumulative curves, and the parameter which describes the progress condition.
Content from these authors
© 2003 Japan Industrial Management Association
Previous article Next article
feedback
Top