Journal of Japan Industrial Management Association
Online ISSN : 2432-9983
Print ISSN : 0386-4812
Applications of the Cost Analysis Model to Equipment Replacement Problems : Replacement Time Determination under Technological Advances
Yasuo KUSAKAHisatoshi SUZUKI
Author information
JOURNAL FREE ACCESS

1989 Volume 40 Issue 1 Pages 53-59

Details
Abstract
The authors[5] have proposed a method to determine the economical replacement times of equipment with technological advances by the control limit policy and have given some case studies. Although this method is practical since the economical replacement times can be simply determined by a graph, it has a problem that the estimation methods of parameters for the cases have not been shown. Therefore, this paper clarifies some typical estimation methods for above-mentioned and other cases, and offers some important viewpoints for generally applying replacement models to practical problems.
Content from these authors
© 1989 Japan Industrial Management Association
Previous article Next article
feedback
Top