Abstract
The paper described on a result of the investigation into the actual condition for routing traffic in Akashi Strait that the execution are under way for the Cross Channel Bridge Scheme. The flow of small vessel (under G. T. 1, 000t) that amounts to 95% in the total traffic volume were distincted by means of the Radar Photogragh and the Observer's Sketch.