Abstract
On an occasion of the newly-founded factory, a cogeneration system driven by 2 sets of 36kW gas-engine was installed in the structure. After one year, several running data were measured and collected.
This paper describes the points of a planning to be considered of a cogen. system, and some characteristics concerned with air-conditioning/heating at the generation of electric power.