Japanese Journal of Radiation Safety Management
Online ISSN : 1884-9512
Print ISSN : 1347-1503
ISSN-L : 1347-1503
Case report
Review Period for Application for the Permission of Changes Pertaining to Required Facility Inspection from JFY 2020 to 2024
Tomokazu SUZUKI
Author information
JOURNAL FREE ACCESS

2026 Volume 25 Issue 1 Pages 18-22

Details
Abstract

Permission users authorized to use radioisotopes or radiation generating apparatus must obtain permission from the Nuclear Regulation Authority in advance when changing the content of their permission. The standard processing period for reviewing this permission of change is set at 90 days. In recent years, the time required for reviewing the permission of change appears to have lengthened. Applications for the Permission of Changes Pertaining submitted by permission users are reviewed and decided exclusively by The Secretariat of the Nuclear Regulation Authority. For those requiring Facility Inspections, The Secretariat of the Nuclear Regulation Authority reports the approval of the application to the Nuclear Regulation Authority. This survey examined the number of days required for reviewing permissions of change from JFY (Japanese Fiscal Year) 2020 to 2024, based on documents reported to the Nuclear Regulation Authority. The result showed an average of 107 days over the five-year period. However, excluding cases where the applicants were hospitals, the average time required was 170 days.

Content from these authors
© 2026 Japanese Society of Radiation Safety Managenent
Previous article Next article
feedback
Top