Journal of the Japan Society of Engineering Geology
Online ISSN : 1884-0973
Print ISSN : 0286-7737
ISSN-L : 0286-7737
Hydraulic Analysis on Groundwater Behavior Around Partially Penetrated Cut-Off Wall
Kuniaki SATO
Author information
JOURNAL FREE ACCESS

1982 Volume 23 Issue 4 Pages 214-220

Details
Abstract
In recent years, a large-scale cut-off wall has been constructed to cut the seepage flow of aquifers in those cases as the excavation works, the underground works and the underground dam in order to store the water resources in this country. It is very important to know several hydraulic effects of cut-off wall, such as the relation between the flow rate and penetration depth of wall, and the groundwater behavior resulting from the penetrated wall.
This paper presents theoretically how to find the change of seepage flow rate and groundwater head by the partially penetrated cut-off wall on the basis of Aravin & Numerov theory. For the sake of practical use, the computation technique of hydraulic quantities under required conditions was proposed by the graph utilization method. The validity of method and theory was confirmed by some experiments of Hele-Shaw model.
Content from these authors
© Japan Society of Engineering Geology
Previous article Next article
feedback
Top