Abstract
Recently, in Japan, “ICOS” Method is introduced in earth improvement.
On the build of Yagisawa dam, “ICOS” Method was adapted for the cut-off wall construction. This wall was successfully constructed. In this report, the author writes the outline of the construction, and sums up the points for the future.