Abstract
All-Interconnected Cascades is proposed as an example of production system to be designed to produce a number of side products of enriched uranium. To analyze the transient characteristics of the side product assays in the proposed cascades system, the code TWIN-SS is developed. If the rotor power supply loss for UF6 centrifuges occurs for a short time in the finishing and/or the base cascades, an allowable power loss time permitting the side product assays to be maintained within the product assay specifications is revealed. Furthermore, even if a long time power supply loss occurs in one base cascade, it is shown that the side product assays can be controlled without the shut-down of the operation of All-Interconnected Cascades by operating an interstage reflux in the finishing cascade.