1998 Volume 4 Issue 2 Pages 33-36
Before the construction of high level radioactive waste repository, the implementing entity will go through three siting stages for the repository. In each of those three stages, the implementing entity will carry out geological surveys. In this report, the concept for the geological surveys is described, on the basic of "The policies for the high level radioactive waste disposal(a tentative draft)" issued by the Atomic Energy Commission in July, 1997.