EXAMINATION AND CONSTRUCTION OF REMOVAL METHODS FOR AGING DETERIORATED OVERPASS
Yuuki TATARAHikaru MURAYAMATakahiro YOSHIDA
Author information
RESEARCH REPORT / TECHNICAL REPORT FREE ACCESS

2025 Volume 2 Issue 1 Pages 49-52

Details
Abstract

 This bridge is located above the Shinkansen tracks, and there are time constraints from the last train to the first train and the environmental constraints of the dense concentration of Shinkansen equipment, so we examined and implemented the issues and successfully completed the removal work.