Abstract
In Long-span prestressed concrete bridges (box girder or cable stayed bridge), the design and construction control become increasingly complex as construction proceeds with step by step process.
This paper presents the method and operation of an automatic levelling module by CCD camera and the experimental results by this system.
Successful application of the system showed the system would be an effective and efficient construction aid.