Abstract
Precast segmental bridges with external tendons and dry joints were employed together with the span by span erection method as the standard structural form for the viaducts in the Bangkok Second Stage Expressway, which contributed in the realization of a megascale rapid construction. This paper, presenting various data, describes the outline of the measures taken in the project such as simplification, standardization etc. and the construction programs and the quality actually achieved.