VARIOUS MEASURES TAKEN AND QUALITY ACHIEVED IN PRECAST SEGMENTAL BRIDGE CONSTRUCTION
Nobuaki ShiraishiToshio Takebayashi
Author information
JOURNAL FREE ACCESS

1995 Volume 1995 Issue 510 Pages 31-41

Details
Abstract
Precast segmental bridges with external tendons and dry joints were employed together with the span by span erection method as the standard structural form for the viaducts in the Bangkok Second Stage Expressway, which contributed in the realization of a megascale rapid construction. This paper, presenting various data, describes the outline of the measures taken in the project such as simplification, standardization etc. and the construction programs and the quality actually achieved.