Doboku Gakkai Ronbunshu
Online ISSN : 1882-7187
Print ISSN : 0289-7806
ISSN-L : 0289-7806
DESIGN METHOD OF RIP RAP SCOUR PROTECTION WORKS FOR PIER IN FAST TIDAL CURRENT
Kazuo IshinoHideo OtaniHidehiro Katsui
Author information
JOURNAL FREE ACCESS

1995 Volume 1995 Issue 521 Pages 123-133

Details
Abstract
Riprap scour protection has been commonly used for piers. But the method of the design is rather empirical. In order to establish the practical and reasonable methods of design, the mechanism of the seepage flow in the scour protection should be carefully examined. The seepage flow is measured both in a hydraulic model test and in a field measurement at Akashi Strait Bridge. A design method of grain size of the inner and surface layer rubble mounds, thickness of rubble mound layer and construction area is proposed.
Content from these authors
© by Japan Society of Civil Engineers
Previous article Next article
feedback
Top