Doboku Gakkai Ronbunshu
Online ISSN : 1882-7187
Print ISSN : 0289-7806
ISSN-L : 0289-7806
RELIABILITY FOR THE PREDICTION BASED ON THE MEASUREMENT DATA OF THE EXCAVATION WORK AND RISK EVALUATION IN THE CHANGE OF DESIGN BY THE OBSERVATIONAL PROCEDURE
Noriyuki KOBAYASHIEtsuro SAITOToshihisa HATANO
Author information
JOURNAL FREE ACCESS

1999 Volume 1999 Issue 631 Pages 193-203

Details
Abstract
Observational Procedure of the excavation work is mainly used for safe management. The prediction based on measurement data during construction is more reliable than the prediction at the design stage before construction. If the values are utilized more effectively, we will be able to execute the construction works rationally. So, Estimation of the design parameters and prediction in the behavior of the structure play the important roles in the observational procedure, and are demanded high reliability.
In this paper, the relationship between the error of measurement data and prediction results and the error in modeling of prediction are specified. And the reliability of the prediction are estimated.
Content from these authors
© by Japan Society of Civil Engineers
Previous article Next article
feedback
Top