LONG DISTANCE DISCHARGING WORKS OF DREDGED SOIL BY PLUG FLOW MIXING METHOD IN PIPE LINES
Akira UEZONOKazuhiko TAKEZAWAShouichi TSUKADAKunio TAKAHASHI
Author information
JOURNAL FREE ACCESS

2000 Volume 2000 Issue 651 Pages 37-45

Details
Abstract
Various kinds of plug flow mixing method which is developed to mix dredged soil with cement during soil conveying work by plug flow have been invented. The discharging distance experienced, however, was only limited to several hundred meters. Recently, a long distance discharging work of approximately one km with three kinds of plug flow mixing method have been conducted to confirm applicability of this method for soil disposal on land at Fushiki-toyama port.
This paper presents technical particulars including unconfined compression strength of the cement mixed soil of the work.
Content from these authors
© by Japan Society of Civil Engineers
Previous article Next article
feedback
Top