2020 Volume 76 Issue 2 Pages I_92-I_103
The purpose of this study is to improve efficiency of design process with contractor based on the experience in accrual MLIT public works projects applied technical proposal and negotiation method. The results of this study revealed the idea on standard procedure and work allocation among designer, contractor and MLIT for design process in early contractor involvement. Based on the proposed idea, different from existing methods such as design-bid-build, the guideline on technical proposal and negotiation method for MLIT public works projects was revised in Jan, 2020.