2020 Volume 76 Issue 7 Pages III_327-III_335
Using open data, the nutrients supply function (active management) of the sewage treatment plant was comprehensively evaluated with the energy recovery function using a sewage treatment plant simulator, According to the calculation using the operation data in winter, which is the target of seasonal operation, the nitrogen concentration (NO3-N) in the treated water increased to 10-13 mg/L and the nitrogen supply increased by 62% in the denitrification suppression operation. In the nitrification suppression operation, the treated water nitrogen concentration (NH4-N) increased to 12-15 mg/L, and the nitrogen supply increased by 85%. The electric power consumption increased slightly in the denitrification suppression operation and decreased in the nitrification suppression operation. By introducing the active management method of "Always suppress nitrification +Duckweed culture", 16-20 mg/L of nitrogen could be supplied in the winter under the condition of nitrogen recovery rate of 70%, and the nitrogen concentration of discharged water was 5.3 mg/L by calculating from the annual discharge load. On the other hand, the annual average power generation was 39,670kWh/day, and the power self-sufficiency rate was 104%, so it was estimated that the power independence could be achieved even in a year.