Abstract
The number of abutments confined by fills constructed on expressways have increased to utilize materials generated on-site and reduce costs. An abutment confined by fill is an abutment constructed on an embankment-ground and supported by piles. In order to build abutments on embankment-grounds, the embankment-ground requires good ground resistance. But, up to now, there is no established method for its design and construction. Accordingly, it became necessary to establish a method. To do this, we have studied 107 cases of embankment-ground constructions on expressways. This report shows their deformation characteristics, settlement characteristics, and the impact of earthquakes on piles constructed in embankment-grounds, and describes how the standards for the design and construction management of embankment-grounds were established based on the findings.