Journal of Japan Society of Civil Engineers, Ser. C (Geosphere Engineering)
Online ISSN : 2185-6516
ISSN-L : 2185-6516
Paper (In Japanese)
DESIGN AND CONSTRUCTION OF EMBANKMENT-GROUNDS FOR ABUTMENT CONFINED BY FILLS ON EXPRESSWAYS
Hirotake NAKAMURASeiya YOKOTA
Author information
JOURNAL FREE ACCESS

2012 Volume 68 Issue 2 Pages 355-374

Details
Abstract
 The number of abutments confined by fills constructed on expressways have increased to utilize materials generated on-site and reduce costs. An abutment confined by fill is an abutment constructed on an embankment-ground and supported by piles. In order to build abutments on embankment-grounds, the embankment-ground requires good ground resistance. But, up to now, there is no established method for its design and construction. Accordingly, it became necessary to establish a method. To do this, we have studied 107 cases of embankment-ground constructions on expressways. This report shows their deformation characteristics, settlement characteristics, and the impact of earthquakes on piles constructed in embankment-grounds, and describes how the standards for the design and construction management of embankment-grounds were established based on the findings.
Content from these authors
© 2012 by Japan Society of Civil Engineers
Previous article Next article
feedback
Top