Journal of Japan Society of Civil Engineers, Ser. B1 (Hydraulic Engineering)
Online ISSN : 2185-467X
ISSN-L : 2185-467X
Annual Journal of Hydraulic Engineering, JSCE, Vol.60
A FLOOD RISK CURVE DEVELOPMENT USING CONDITIONAL PROBABILITY DISTRIBUTION OF RAINFALL ON DURATION
Tomohiro TANAKAYasuto TACHIKAWAYutaka ICHIKAWAKazuaki YOROZU
Author information
JOURNAL FREE ACCESS

2016 Volume 72 Issue 4 Pages I_1219-I_1224

Details
Abstract
 To design integrated flood risk management, flood risk assessment based on the economic damage is essential. In previous studies, the authors have developed a method to estimate a flood risk curve considering spatio-temporal distribution of rainfall by applying the Synthesis Probability Method (SPM) that estimates probability function of annual maximum flood peak discharge (AMF). Recently, the SPM was improved by introducing the relation between total rainfall and the duration time, and the estimated probability distribution of AMF with the improved SPM showed a better agreement with the probability distribution of observed AMF. This study extended the improved SPM to flood risk curve development and estimated a flood risk curve of the Ayabe city in the Yura-gawa River basin.
Content from these authors
© 2016 Japan Society of Civil Engineers
Previous article Next article
feedback
Top