Japanese Journal of JSCE
Online ISSN : 2436-6021
Special Issue (Hydraulic Engineering)Paper
EXPERIMENTAL STUDY ON CHANGE OF OVERFLOW STRUCTURE FLOW DURING EMBANKMENT EROSION AND EFFECT OF PROTECTION WORK FOR TOE OF SLOPE
Taka-aki OKAMOTOShoshi NATSUMETakeshi KODAKAKeita LEEKazumasa MATSUMOTOMichio SANJOU
Author information
JOURNAL RESTRICTED ACCESS

2025 Volume 81 Issue 16 Article ID: 24-16115

Details
Abstract

 The present study aims to investigate the effect of protection work for slope and toe of slope on embankment erosion due to overflow by laboratory experiments. For four cases with different lengths of protection work, we examined the depth of scour hole and embankment collapse due to overflow. Next, PIV measurements were performed to investigate the flow velocity in scour hole.

 For long protection work case, the angle of the overflow at toe of slope decreases and scour hole depth was reduced. Consequently, the sediment of embankment was not sucked out and the collapse time of embankment increases. For short protection work case, after the scour hole depth increases, the angle of the overflow at toe of slope decreases and the erosion speed reduces.

Content from these authors
© 2025 Japan Society of Civil Engineers
Previous article Next article
feedback
Top