Journal of Japan Society of Civil Engineers, Ser. B3 (Ocean Engineering)
Online ISSN : 2185-4688
ISSN-L : 2185-4688
Annual Journal of Civil Engineering in the Ocean Vol.27
ABOUT THE APPLICABILITY OF RI-CPT CONCERNING THE GROUND SURVEY AND THE EXECUTION MANAGEMENT FOR TOKYO INTERNATIONAL AIRPORT D RUN-WAY PROJECT.
Tsunehiro SAKAIYAMisturu TAKAHASHIDaisuke KIUCHITakatoshi NOGUCHI
Author information
JOURNAL FREE ACCESS

2011 Volume 67 Issue 2 Pages I_429-I_433

Details
Abstract
  Tokyo International Airport D Run-way Project is construction that newly establishes the fourth glide slope Tokyo International Airport(Haneda) offshore. D Run-way Project is constructed on the soft ground. It designed in expectation of a strength increase by consolidation. Therefore, it is necessary to understand the situation of the ground accurately. D Run-way Project, the strength management method by RI-CPT was adopted. In this text, the investigation management technique by RI-CPT is described. It is the one that considers the result of the examination. Tokyo International Airport D Run-way Project was completed by adopting this construction management method in a short term of the remainder of 41 months
Content from these authors
© 2011 Japan Society of Civil Engineers
Previous article Next article
feedback
Top