Journal of Japan Society of Civil Engineers, Ser. B3 (Ocean Engineering)
Online ISSN : 2185-4688
ISSN-L : 2185-4688
Annual Journal of Civil Engineering in the Ocean Vol.30
ESTIMATION OF TSUNAMI DAMAGE AND PLANNING OF PROTECTION MEASURES IN TOKYO BAY
Jun OYATomoya SHIBAYAMAYuuki SEKINE
Author information
JOURNAL FREE ACCESS

2014 Volume 70 Issue 2 Pages I_49-I_54

Details
Abstract
 Tsunami numerical simulations are performed. The selected tsunamis are caused by Keicho, Genroku and the northen bay of Tokyo earthquakes. These tsunamis cause big disasters around Tokyo bay in the future. The damage of tsunami and the cost of protection measures against tsunami are calculated. By using these results, the cost and the benefit are compared. As a resut, the damage of Keicho tsunami is 6.95 trillion yen, for Genroku tsunami it is 5.04 tillion yen and for the northern Tokyo bay tsunami it is 4.54 trillion yen. The cost of protection including seawall and water gate are 1.05 trillion yen. The cost of building with pilotis is 15.0 trillion yen The probabilities of occurrence of earthquakes and cost-benefit ratios are calculated. As a result, B/C is 9.97 if we protect by using seawall and water gate. B/C is above 1.0 if we protect by offering public support to house owners up to 60 percent of the cost of construction of pilotis.
Content from these authors
© 2014 Japan Society of Civil Engineers
Previous article Next article
feedback
Top