Utilization of BIM/CIM is becoming active in port construction. The system is to provide information to the workers and engineers through a large display and a tablet to confirm the construction methods and to examine the construction procedures. The advantage of BIM/CIM is that it is possible to find defects and hazardous locations by pre-construction simulations.
It is considered that there is a small difference between the BIM/CIM models and the above-mentioned confirmation methods, the more these things can be discovered and improved. Here, the above-mentioned improvement activities were carried out by VR using BIM/CIM data, and the development method used at that time was shown. Besides, we have summarized the model layout and the objects necessary for virtual space that reduces the deviation from the reality in the actual implementation in the field. Moreover, the issues discovered from these are shown.