2005 Volume 15 Issue 4 Pages 327-330
The destratification system was considered in ANEGAWA dam reservoir during the dam construction was exceeded, and facilities were installed later. Facilities began to operate and it was reported that they were able to be confirmed the effect. The measures showed an effect by operating the destratification system according to the prediction at first.