Abstract
Sg. Kinta Dam is the first RCC (roller compacted concrete) dam to be constructed in Malaysia. The volume of the RCC used in the dam is approximately 1 million meter cube. The detail of the production equipments such as the crushing plant or RCC mixing plant is not stated in the specification as well as the RCC method statement. Therefore the contractor is able to select and plan these production equipments and method statement flexibly. Because these selections are much affected the economical impact, it is important that the planning is to be properly by well understanding the idea and philosophy of the designer. This report is described the record till now and the problem to be solved with regard to the production equipments including the dry type crushing plant and RCC continuous mixing plant as well as the RCC method statement including the grout enriched-RCC and the slope layer method which are adopted in this project.