Design and Construction of Masudagawa Dam
Toshihiro NAKAMURA
Author information
JOURNAL FREE ACCESS

2008 Volume 18 Issue 2 Pages 111-117

Details
Abstract
The goal of the Masuda river flood control dam construction project is to construct Masuda river dam for flood control and to redevelop Sasakura dam for stable water intake and conservation of riverine environment. Masuda river dam, which was completed and in-service in FY2005, only for flood control, is rare in the country for equipped with steady drop inlet spillway at its bottom without gate. In this paper, the background of adopting the dam only for flood control; reallocating the storage capacity, which is the main characteristic of Masuda river dam, is reported. In addition, a brief overview of designing and constructing of the steady drop inlet spillway at the bottom is reported.
Content from these authors
© 2008 by Japan Society of Dam Engineers
Previous article Next article
feedback
Top