Intelligent Construction Work in Moriyoshizan Dam Projects:
Trial in-situ of Real Time Construction Management System
Kouichi OGURAHiroshi FURUYAYoshihiko HIKITAKeisuke HIGO
Author information
JOURNAL FREE ACCESS

2008 Volume 18 Issue 3 Pages 156-165

Details
Abstract

Field banking tests are ordinary carried out to specify the construction method to control the quality of the rock-fill dam bank. While constructing dam body, in-situ density tests are executed to judge the fill quality. But the tests need a lot of time and effort, so a new quality management system is demanded.
This paper reports about the trial case of the real time fill quality management system using the 3D-CAD, GPS, and "α-system".