Abstract
At Kaore arch dam consutructed for upper reservoir of Okumino pumped-storage power plant, behaviors of dam and foundation rock are measured elaborately in order to inspect design conditions and carry out safety test filling. In this paper results of measurements and analyses are shown from the beginning of test filling. And useful results for design and construction of arch dam are introduced.