Abstract
A system has been developed to secure stable working efficiency and safety when constructing concrete dams, and as a countermeasure against a shortage of skilled workers. This system was used in Niigata Prefecture Oku-Miomote Dam Project and displayed good performance which was equal to the skill operator. The present paper outline the system and describes some observation results on automatic operation.