Consideration of the operational change after constraction in the projects of the Environmental Impact Assessment Law
Chigusa HANAOKAYoshiaki AIDA
Author information
JOURNAL FREE ACCESS

2020 Volume 18 Issue 2 Pages 25-32

Details
Abstract

The environmental impact assessments are conducted to the projects that “changes the shape of the terrain or that involves the construction of a new structure, or that is engaging in other similar activities” by the procedures in accordance with the Environmental Impact Assessment Law. After the construction of the project by the proponent, the constructs should be used for the original purposes in accordance with the way and method that settled during the assessment. We consider the some actual examples of the way and method after the constructions.