Abstract
As a conformity field system to future re-land readjustment, the author and others has proposed the Road Removal-Type Contour Plot Field System (RRC-PLOTS), and as for this field system there is a major feature in the point which expands field lot to contour line direction at the time of re-land readjustment. In order to apply this field system, it is necessary for the object field to satisfy several conditions for characterizing this, but the fields which have the condition such as that at present stage are few. Because of this, as for the application object of the same construction method there is a tendency which is thought quite it is little, has become also the cause of obstructing the spread. With this manuscript, “ expanded RRC-PLOTS” was proposed as the field form which eases the restriction in regard to such application, the fact that extensive application is possible was shown. In addition, discussed is that it should examine conditions (namely, the time for moving between lots by crossing ditch levee, the areal reduction and the weeding area), comprehensively at the time of deciding the field form.