Volume 46 (2003) Issue 1 Pages 100-106
Marine research vessels and their systems are major assets in the marine resources development. Since the running costs for the ship are very high, it is necessary to reduce the total cost by an efficient scheduling for operation and maintenance. To reduce project period and make it efficient, we applied TOC project management method that is a project management approach developed by Dr. Eli Goldratt. It challenges traditional approaches to project management. It will become the most important improvement in the project management since the development of PERT and critical path methodologies. As a case study, we presented the marine geology research project for the purpose of operations in addition to repair on the repairing dock projects for maintenance of vessels.
JSME international journal. Ser. 1, Solid mechanics, strength of materials
JSME international journal. Ser. A, Mechanics and material engineering
JSME international journal. Ser. 3, Vibration, control engineering, engineering for industry
JSME international journal. Ser. C, Dynamics, control, robotics, design and manufacturing
JSME International Journal Series A Solid Mechanics and Material Engineering
JSME International Journal Series B Fluids and Thermal Engineering