Applying the TOC Project Management to Operation and Maintenance Scheduling of a Research Vessel
M. Firdausi MANTIHideo FUJIMOTOLian-Yi CHEN
Author information
JOURNAL FREE ACCESS

2003 Volume 46 Issue 1 Pages 100-106

Details
Abstract
Marine research vessels and their systems are major assets in the marine resources development. Since the running costs for the ship are very high, it is necessary to reduce the total cost by an efficient scheduling for operation and maintenance. To reduce project period and make it efficient, we applied TOC project management method that is a project management approach developed by Dr. Eli Goldratt. It challenges traditional approaches to project management. It will become the most important improvement in the project management since the development of PERT and critical path methodologies. As a case study, we presented the marine geology research project for the purpose of operations in addition to repair on the repairing dock projects for maintenance of vessels.
Content from these authors
© 2003 by The Japan Society of Mechanical Engineers
Previous article Next article
feedback
Top