JSME International Journal Series C Mechanical Systems, Machine Elements and Manufacturing
Online ISSN : 1347-538X
Print ISSN : 1344-7653
ISSN-L : 1344-7653
PAPERS
A Scheduling Method for Painting Line under Pull Production
Jae Kyu YOOKojiro SHINBOYoshiaki SHIMIZU
Author information
JOURNAL FREE ACCESS

2003 Volume 46 Issue 1 Pages 88-92

Details
Abstract
This paper concerns with a scheduling method for painting (preceding) line with much longer production lead-time than assembly (subsequent) line. In general, production schedule of the painting line is made independently based on the forecasted job requirement at the assembly line. When the job requirement changes at the assembly line by virtue of the change of customer order, therefore, production balance is destroyed between the both lines. To avoid the tardiness caused by such unbalance, we need to have many inventories for the painting line. Such countermeasure is taken place in many companies actually. Thus, to avoid the tardiness while keeping small inventory, we propose a scheduling method that makes a Pseudo-Pull production possible for the painting line. We have evaluated the proposed method through computer simulations.
Content from these authors
© 2003 by The Japan Society of Mechanical Engineers
Previous article Next article
feedback
Top