The Proceedings of the Dynamics & Design Conference
Online ISSN : 2424-2993
2008
Session ID : 522
Conference information
522 Study on the skill-less technology for large size carrier for plant construction
Atsushi KATOYasutaka TAGAWAKoichi SAKIMOTOSizuo IMAOKAMasaomi WADA
Author information
CONFERENCE PROCEEDINGS FREE ACCESS

Details
Abstract
Recent years, Modular construction method is used for shortening of a construction period in a large-scale construction site. Module is combination of construction and member of framework structured at factory. It is necessary for leveling of module when hauling module out of the ground with a crane in order to save the worker. It is able to solve this problem with calculating tension of wire beforehand. In this study, first time, we introduce method for calculating tension of wire that level off module and equalize each load of wire. Next, compare calculated value and experiment value. This is expected to shorten time of a construction period and simplify adjusting load of module.
Content from these authors
© 2008 The Japan Society of Mechanical Engineers
Previous article Next article
feedback
Top