Host: The Japan Society of Mechanical Engineers
Name : Dynamics and Design Conference 2023
Date : August 28, 2023 - August 31, 2023
When contact wires wear out on an electric railway, they must be replaced. For the Shinkansen, even if the wear is localized, the entire one drum is replaced instead of partial replacement. Therefore, there is a need to establish a partial replacement method for Shinkansen trains from the viewpoint of labor-saving and cost reduction in maintenance work. Therefore, this study analytically examines the effect of the irregularity in OCL.