ICONE15-10792 Completion of Latest ABWR "SHIKA Unit 2" Construction
Tatsuhiro YamazakiYuichiro Yoshimoto
Author information
Keywords: ABWR, Plant, Construction, CAD, Module
CONFERENCE PROCEEDINGS FREE ACCESS

Details
Abstract
The Shika Nuclear Power Station Unit No.2 of the Hokuriku Electric Power Company, Inc. is the first Advanced BWR unit built in Japan by a single contractor and it is among the largest nuclear power stations in Japan. Its construction started in August 1999 when the first construction permit was issued. The design and construction of the plant was carried out with utmost care for betterment of operational safety, reliability and economy. The construction advanced on schedule and the plant entered its commercial operation in March 2006 as planned. Hitachi, Ltd. supplied the entire plant from design, fabrication and construction including the reactor and steam turbine generation system. In the design and construction of the plant, the most advanced technology has been applied in order to match the civil construction process and aim to supply safest, reliable and economical power plant .
Content from these authors
© 2007 The Japan Society of Mechanical Engineers
Previous article Next article
feedback
Top