The Proceedings of the International Conference on Nuclear Engineering (ICONE)
Online ISSN : 2424-2934
2015.23
Session ID : ICONE23-1525
Conference information
ICONE23-1525 ACCOMPLISHMENT OF JT-60U DISASSEMBLY WORK DEALING WITH RADIOACTIVE COMPONENTS
Yoshitaka IKEDAJT- Team
Author information
CONFERENCE PROCEEDINGS FREE ACCESS

Details
Abstract
The upgrade of the JT-60U to the superconducting tokamak "JT-60SA" has been carried out to contribute the early realization of fusion energy by addressing key physics issues relevant for ITER and DEMO. Disassembly of the JT-60U tokamak was required so as to newly install the JT-60SA torus at the same position in the torus hall. The JT-60U tokamak was featured by the complicated and welded structure against the strong electromagnetic force, and by the radioactivation due to deuterium-deuterium (D-D) reactions of 1.5x10^<20> (n) in total. Since this work was the first experience of disassembling a large radioactivated fusion device in Japan, careful preparations of disassembly activities, including treatment of the radioactivated materials and safety work, have been made. About 13,000 components with a total weight of more than 5,400 tonnes were removed from the torus hall and stored safely in storage facilities. All disassembly components were stored with recording the data such as dose rate, weight and kind of material, so as to apply the clearance level regulation in future. It was confirmed that the main radioactive material of the disassembly components was the stainless steel and that its dose rate was almost background level (〜0.1μSv/h) at 〜10m far from the vacuum vessel. It seems that the disassembly components with background dose level are in the clearance level. The assembly of JT-60SA tokamak has started in January 2013 after this disassembly of the JT-60U tokamak.
Content from these authors
© 2015 The Japan Society of Mechanical Engineers
Previous article Next article
feedback
Top