The Proceedings of the International Conference on Nuclear Engineering (ICONE)
Online ISSN : 2424-2934
2023.30
Session ID : 1369
Conference information

RESEARCH ON THE APPLICATION OF RISK-INFORMED TECHNOLOGY IN THE PERIODIC TEST CYCLE OPTIMIZATION OF SEBIM VALVE IN RESIDUAL HEAT REMOVAL SYSTEM OF NUCLEAR POWER PLANT
Li-hui CHENShui-xiang YEWen-bo LUO*Shi-jun CHEN
Author information
CONFERENCE PROCEEDINGS RESTRICTED ACCESS

Details
Abstract

This paper introduces the practical experience of risk-informed technology in China. Taking a pressurized water reactor nuclear power plant in China as an example, aiming at the problems and risks existing in the periodic test one cycle of pilot operated safety valve (SEBIM valve) of Residual Heat Removal (RHR) system of nuclear power plant, and according to the essence of risk-informed technology, a plan for optimizing the periodic test cycle is proposed. This paper mainly discusses the application of risk-informed technology in the periodic test cycle of SEBIM valve in RHR system of nuclear power plant by using the combination of determinism and probability theory. The results show that the extended periodic test cycle of SEBIM valve in RHR system meets the requirements of relevant regulations and guidelines, and the risk introduced by optimization is small and acceptable, which verifies the feasibility of the optimization scheme, and points out the degree of influence of long-term performance monitoring of valves on the optimization scheme, so as to support the comprehensive decision-making of nuclear power plants.

Content from these authors
© 2023 The Japan Society of Mechanical Engineers
Previous article Next article
feedback
Top