The Proceedings of the International Conference on Power Engineering (ICOPE)
Online ISSN : 2424-2942
2003.1
Conference information
C107 Outline of the Unit 4-1 train of Our Higashi Niigata Thermal Power Station And Operating Records
N. EndouN. SakumaS. OhnoY. NishimuraN. Fujita
Author information
CONFERENCE PROCEEDINGS FREE ACCESS

Pages _1-167_-_1-172_

Details
Abstract
With the set-in of the 21st century, energy and environmental problems such as energy security and global warming are sparking much greater controversy as burning issues that sways the fate of human beings. One of technologies presently available to deal with these issues is combined cycle power generation facility that can enhance the efficiency of power generation. At Tohoku Electric Power Company, we successfully developed and introduced Japan's first large-capacity combined cycle power plant (Higashi Niigata Thermal Power Plant Unit 3) in 1985. Going through experience in the operation and maintenance of this plant, we set about R&D on a high-efficiency gas turbine in 1987. The Unit 4-1 train of our Higashi Niigata Thermal Power Station was constructed by applying the results of this high-efficiency gas turbine R&D program, and by applying expertise we gained from the planning, construction, operation and maintenance of the Unit 3 train.
Content from these authors
© 2003 The Japan Society of Mechanical Engineers
Previous article Next article
feedback
Top