Abstract
In the new era of mounting awareness of sustainable development, the distributed power generation is become one of energy system alternatives under consideration. This paper deals with a cost model of distributed power generation. An office building distributed energy system located in Beijing is investigated as a sample of the model. In line with the office building's energy demand profile and the characteristics of Beijing local electric network, an economic feasibility study on the distributed power generation at a competitive electric market structure is presented.