The Proceedings of the International Conference on Power Engineering (ICOPE)
Online ISSN : 2424-2942
2003.3
Conference information
C304 250MW AIR BLOWN IGCC DEMONSTRATION PLANT PROJECT
Shozo KanekoYoshitaka IshibashiJun Wada
Author information
CONFERENCE PROCEEDINGS FREE ACCESS

Pages _3-163_-_3-167_

Details
Abstract
Japan's original "Air-blown IGCC" development, one of the most important national projects, has stepped up to enter in the final phase - demonstration. A 250MW plant is being constructed for demonstration. In order to conduct the project, a new company "Clean Coal Power R&D Co., Ltd. (CCP)" has been established on June 15th, 2001 by the nine regional utility companies of Japan, Electric Power Development Company (EPDC) and Central Research Institute of Electric Power Industry (CRIEPI)(hereafter called as '11 corporations'). Plant construction will start in 2004 followed by operation tests through 2009. This paper presents the latest status of the project and outline of the demonstration plant.
Content from these authors
© 2003 The Japan Society of Mechanical Engineers
Previous article Next article
feedback
Top