The Proceedings of Mechanical Engineering Congress, Japan
Online ISSN : 2424-2667
ISSN-L : 2424-2667
2011
Session ID : G100013
Conference information
G100013 Oscillation Suppression of Cargo Handling Tower Crane by Two-Stage Slewing Pattern
Yuji MURASAWAMasahito UEDATetsu NISHIMURA
Author information
CONFERENCE PROCEEDINGS FREE ACCESS

Details
Abstract
A tower crane is widely used in a dam construction site. As the crane gyrates, a cargo swings in the circumferential and radial direction. In order to carry cargos to a required position in short time, the swinging motion should be suppressed. Since the crane operation is strongly relied on the operator's empirical technique simple automatic crane operating procedure by which swinging motion is suppressed enough to complete conveyance in a short time is strongly required. In this study, two-stage velocity pattern was adopted for simple automatic operation to minimize residual swinging motion. The applicability of the proposed method was investigated by means of numerical simulations.
Content from these authors
© 2011 The Japan Society of Mechanical Engineers
Previous article Next article
feedback
Top