Abstract
This research propose a method of production scheduling using autonomous distributed systems which includes not only machine but also Human and AGV's schedule. Moreover this method realizes real time scheduling and parallel scheduling. Therefore, a new structure of production scheduling is proposed, which can realize to change a type of production scheduler to correspond with a type of production system. Especially this paper focuses on the effect of bottle neck process. Some sample experiment is performed and some problem is discussed.