Abstract
Generally, wind conditions of the middle grade mountain areas are more unstable than the coast parallel. Therefore, it is considered that it should be utilized by combining with other new energy of solar light and rivers, etc., in order to utilize the wind in the inland. Then, this study carried out wind condition investigations of the campus in this department which was just located in the center in Fukushima Prefecture, and it examined solar light and wind force and hybrid power generating system using the river. The solar photovoltaic generation force is the plan that 20kW, wind power generation force hybridize and that the hydraulic power generation force hybridizes at 40kW and about 20kW on the scale of the system.